CNET cn5614xr Specifications Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 86
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Installing the Cabinet
1-8 Section 1: Installing the Cabinet DS2000 Hardware Manual
Installing the Cabinet
Planning the Installation
Before installing the common equipment, you should mount a Main Distribution Frame (MDF) plywood back-
board in a centrally located spot. A 1/2 sheet of plywood (4’ x 4’) should be adequate for a 4 slot cabinet (see
Figure 1-1
4 Slot Cabinet Installation Layout
below). A full sheet of plywood (8’ x 4’) should be adequate for
an 8 slot cabinet (see Figure 1-2
8 Slot Cabinet Installation Layout on page 1-9
). Be sure to mount the back-
board using suitable fasteners, taking care to adhere to standard installation practices and local codes.
The equipment cabinet requires a three-prong, dedicated 110 VAC 60 Hz circuit (NEMA 5-15 receptacle).
The AC receptacle must be within 7 feet of the cabinet’s lower left corner.
Normally, you install the extension and trunk blocks to the right of the cabinet. Telco should also install the
RJ21X to the right of the cabinet.
!! Important !!
Local codes may prohibit you from installing extensions,
trunks and optional equipment in the same blocks.
Figure 1-1: 4 Slot Cabinet Installation Layout
80000 - 15A
Plywood backboard
Dedicated
AC Outlet
Surge
Protector
To earth
ground
To telco
ground
Station
Blocks
Station
Blocks
Trunk
Blocks
4'
4'
Note: The system will respond to telco ring signal in the
range of 40-130 VAC @ 20 Hz.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 85 86

Comments to this Manuals

No comments